Well the big moment we’ve all been waiting for arrived last week. It finally came time to say goodbye to our home of 7 years and start the process of setting up the new space. First we were astounded by how much equipment and “stuff” we had in just 1,000 square feet. Second, it’s just incredible how much time it takes to set all of this up. Thank goodness we had Bob Zelin heading up the engineering so we could work on everything else.
The old Rialto suite torn down and ready to move.
Wally World, my edit suite for almost 7 years, time to say good bye and thank you for all the memories…
John and I loading up the truck with as much as possible. We were able to do the entire move with just two trips in the big truck and probably 10 in the smaller vehicles.
The big warehouse at the new offices really made for a sweet and pretty easy load in. Something we definitely did not have at the old space.
Wally World is now my office. This was how I found it after we started moving in and had to laugh. Had no idea I had that many toys.
Beaker 3PO apparently has something to say to Bumbles.
Hmmm, wonder what they’re doing….. All will be revealed in due time.
The incredible Bob Zelin fresh from his drive up from Orlando gets started in The Core. Bob designed the entire engineering plan for both our original facility and this new space.
Day one, hour one, notice how big his smile is! Let’s see how he looks on day three…..
Making a card change in one of the new Macs.
Updating one of the new Macs. The chair makes a nice monitor stand.
VTR 1 goes to input 6 which is connected to audio matrix 8 and that goes to Edit 1 via the AJA 10AVA which also feeds into the conference room and that goes into the flux capacitor and as long as the rack hits 80 miles per hour we should get good picture into the theater.
Edit 4 starting to come together.
Day two, still smiling! Still going 100 miles per hour….
Voice Over room starting to take shape. Bass trap is in there and it’s ready for some acoustic treatment.
Adrienne testing out Edit 3. So far, Bob’s wiring is working!
Edit 5 shaping up. The new Dell UltraSharp monitors are just spectacular.
Day three with a happy client and an even happier engineer. He’s done!
Really nice looking rack assembly designed by Bob. Notice we have a lot of blank space to allow for easy expansion. We will probably add some more storage and maybe another computer or two this year. Already have the space for them.
So we’re getting really REALLY close. Still shaking down the equipment, getting things in place and then we’ll be ready to open our doors. Want to come see the place? Well sign up for the big Open House Event! Click the link and scroll down to the bottom of the page to register. Gonna be a fun night!!