We went into the building on Saturday to do some of the detail painting and found a completed parking lot! Finally, we can stop walking through mud and dirt to get into the building. Landscaping came out fantastic too. It’s a good base to get us started and we’ll definitely be modifying it as we move along.
“Time Lapse” View one. You can see how nice the landscaping came out up the right side.
“Time Lapse” view two. Amazing how nicely everything cleans up when the parking lot goes in.
“Time lapse” view three. We have something like 21 or 24 total parking spaces in the lot so we’ll finally have plenty of room for everyone to park.
My nephew Quinn pitching in with the broom. Slow and steady….
Me and Rebecca’s sister Heather laying down some very expensive “Frog Tape” in one of the offices. It’s like that blue painter’s tape that you use for keeping paint edges clean, but this stuff supposedly creates very hard edges, which is what Rebecca was looking for. Always saw that tape at Home Depot but never got it until now, hope it’s worth the money….
Heather working on a cool little detail in the JungleLand room.
My edit suite coming along with some details outlined.
Frog tape removed. Rebecca painted that center area that same 18% grey we’re using in the edit suites and then applied a metallic glaze to give it a silver appearance. It came out really great!
Looks like the frog tape was worth it! Look at that sharp edge. That’s so much better than with blue tape.
Details filled in my edit suite. That’s a detail I didn’t have in my original edit suite and it really adds some neat elements to it.
Here’s a nice look at the back. We absolutely love this location with the natural backdrop. So when we want to take a break, we can go out back and toss the frisbee around with Molly!
Another week done and the building is moving along. Next up, ceilings, flooring and then the lighting starts going in.