Moving along in our new building process, the surveyor has done his work out on the site. Makes no sense to me whatsoever, just a bunch of orange ribbons attached to stakes and trees out there. Still waiting to see his drawing, but he’s satisfied with the land and our idea for the location of the building and the parking lot.
Since we’re going to be laying down a fairly large parking lot, around 24 parking spaces, my contractor and I are going to look for a good spot on the site to lay out a regulation half basketball court for outside. Since he has to bring in all that asphalt equipment anyway, might as well lay down a nice basketball court at the same time! I used to play and Adrienne played back in high school so she’s excited about this too. We’ll definitely have to mark off the 3 point arc. So I’m seeing some good 2 on 2 or 3 on 3 basketball in our lunchtime future……
Part of the fun of starting from scratch. We need to bring out a bunch of heavy equipment anyway, so try to figure out “little things” you can do cheaply while the equipment is there.
Sorry, the comment form is closed at this time.