Stopped by tonight and we can really see the facility coming together now.
I’m standing in the Conference room looking back across the facility. That’s Rebecca standing in the kitchen. On the right side of the picture are Edit Suites 5 – 8. Far left side of the picture are Edit Suites 1 – 4. And right down the middle is the central core with the bathrooms, Media Library, Machine room and Screening Room.
Another look at the central core. Bathrooms are right in front of me. The framer is standing just inside the machine room with the VO booth closer to me. You can see the door to the VO booth on the left. The second framer is standing near the back wall of the Screening Room.
Putting together the back wall of the Screening Room.
Looking down the back hallway. That’s the door to my office on the right. Yay! I’ll finally have my own office!
Piles of bricks ready to be installed. We got a nice pattern that includes some red, black and greyish colors so it’s not just a flat color.
The brick masons should be on site shortly and then we’ll start to see what we have. I’ll be nice to cover up that steel with some good looking brick!
The facility is changing on a daily basis now! Absolutely impressed with the framing work going on, these guys are working hard!