Joe and I headed on over to check out the site again today as we were told the grading is finished. Sure enough, the site looks great!
“Time Lapse” position one. You can see the nice flat, level area on the back of the lot where the building will sit.
“Time Lapse” position two. Pipes left over from the storm drain system are in the foreground. Those will be gone soon enough.
“Time lapse” position three. The gravel is essentially where our driveway coming into the lot will be. The parking lot will run pretty much all along the silt fence down the left and around to that area in the back of this picture. Our lot actually continues for quite a ways past that silt fence in the back of the picture. We’re only clearing around 1/2 to 3/4 of an acre. The entire lot is 1.6 acres!
View from the back of the lot looking back towards the street. You can really see how nice and flat this area is in the foreground where the building will sit.
Well there you go. Still dirt, but the project is moving along at a nice steady pace. Next up will be putting up the forms for the foundation and then pouring the slab. While we were there we met the owner of the lot right next door to ours. Really nice guy and he’s thinking of finally putting up his new building.