Major changes outside today. From morning to afternoon the exterior took on a major change…..
8:30am, prepping the parking lot, smoothing and grading everything properly.
Looking further to the left, dump truck taking away some of the extra dirt left over in the parking lot.
8:30am working the hill in back of the building. Prepping for laying down matting which will help to hold the hill in place until the grass takes hold.
Just like my old Tonka toys, only MUCH bigger!
Smoothing out the parking lot. Really gotta get a chance to play with one of these things.
12:30pm, landscaper smoothing out the land alongside our property to clean it up.
12:30pm, dirt is gone, replaced by gravel.
Smoothing the gravel in the driveway as a tree is set up in the foreground.
The big Tonka toy smoothing gravel.
Nice clean river rocks up against the building to make for much easier maintenance.
Smoothing the gravel on the side of the building.
Roger, Jenny and Adrienne check out the new landscaping behind the building. Eventually we will be turning this into a really nice outdoor enjoyment area.
As you know, asphalt is very hot when it goes in. Kind of a cool haze is created though with the backlighting from the sun.
Smoothing out and moving the asphalt by hand. They guys were doing one heckuva job out there. Just another in a line of outstanding subcontractors brought in by Joe and Metal Building Associates on this project. Could not be happier with the work of everyone.
Smoothing out the parking lot in front of the building.
Well this is where we left them at 5:00pm tonight. They were still waiting on more asphalt trucks to show up so hopefully they got everything done. We’ll know in the morning when we go back to do some more painting….