John and I stopped by this afternoon to take a quick look at the progress on the bricks. Lower level is about done and they’re ready to get moving up on the scaffolding. Really loving the color scheme too.
A look at the left side of the building around the garage door. That brick is about 4 1/2 feet high and they are about ready to transition to the scaffolding.
Looking at the left side and across the front of the building. You can see they’ve got the brick to the same level all the way down the front and they were just finishing up on the right side of the building this afternoon.
The hands of a craftsman laying the brick down a string line. That string is nice and level. They keep moving it up one brick height at a time as they move along. It’s like clockwork with these guys. Very talented folks!
A look down the front of the building looking from the right side back to the left.
There’s a nice cross section of the colors in the brick in the sunlight. Kind of hard to see but there’s some purple in the various shades of color. I like the randomness of it all.
Sorry, the comment form is closed at this time.