We are officially 6 months into the construction of our new facility and are down to the final elements. Parking lot is striped. Floors and ceilings are fully in, now it’s time to finish and move in! Today Joe and I worked on some of the detail work in the game room and machine room.
45’s and LP’s from our personal collection. Been years since we’ve listened to them so they’re becoming part of the 50’s / rock n’ roll diner motif. We have a 16″ stripe along the wall to decorate so I used some paper on the floor to lay out the pattern first before we started putting them on the wall.
Joe puts up the center LP. Only the best rock and roll album of all time. The Boss, “Born to Run.”
Records in position on the stripe. The building was pretty cold today, 20 degrees outside, so we needed to use some blue painter’s tape to hold the albums in place while they dry.
Main kitchen area really coming together nicely now. Dishwasher and sink are in place, we’ve got everything pretty much painted, still need to do some second coats and clean up. Soda fountain table is in the room now.
All the main cabling was brought down through the ceiling and into the machine room. All cabling and power will be dropped from the ceiling so there will be zero cables on the floor when we’re said and done. Joe came up with a nice pipe setup to make the drop clean.
Detail of the cable drop. I like everything to look clean and neat. Those pipes absolutely do the trick. And since we have a drop ceiling, we can switch tiles around if we decide we want to drop them down to the left or right.
Getting close now!